CLARK COUNTY FIRE STATION #20
METRO (LVMPD) SUBSTATION
WETLANDS PARK NATURE CENTER
NATIONAL PARK SERVICE
MIA TERMINAL 1 TICKET COUNTER
TRAINING SUPPORT CENTER
INVITATION TO BID
We are requesting bids and material quotations from qualified subcontractors and suppliers for the projects listed below.Should you be interested in sending a bid, please submit a bid online or download and fill out the project details form and fax it back to (702) 648-2001.
If you need additional information contact us via email or call us at (702) 656-8300
CLARK COUNTY FIRE STATION #20
The work consists of the construction of approximately a 12,060 square foot, single story, 3 bay fire station housing fire department personnel and related emergency vehicles and equipment.METRO (LVMP) SUBSTATION
ELDORA/CIMMARON
This project consists of construction of a new facility approximately 23,566 sq. ft. single story for the LVMPD.NATIONAL PARK SERVICE (LAKE MEAD REC. AREA)
REPLACE INTERIOR/EXTERIOR WINDOWS & DOORS GLAZING
Replace interior and exterior door glazing ands all exterior doors and frames, prep existing frames, paint frames and doors as specified. There is also a requirement to mitigate minor lead based paint contaminates.WETLANDS PARK NATURE CENTER
and PARK EXPANSION
The work consists of the construction of two separate structures combined to equal approximately 34,183 square feet on approximately 5.41 acres to include a main two-story building including a visitor's center, finished exhibition hall, conference rooms, park police office, and recreation offices. Construction includes the off-site improvements including parking, shade structures, landscaping, site concrete, electrical, lighting.MCCARRAN INTERNATIONAL AIRPORT
TERMINAL 1 TICKET COUNTER CONVEYOR REPLACEMENT
The work generally consists of the replacement of various curbside and ticket counter conveyors in Terminal 1 of McCarran International Airport. Specific scope includes the replacement of three (3) designated curbside conveyor lines; one (1) oversize conveyor line; all existing ticket counter conveyor lines in Terminal 1, excluding the ticket counter conveyor lines currently serving Southwest Airlines located at the South end of Terminal 1; and the replacement of various electrical controls.TRAINING SUPPORT CENTER
FORT CARSON, COLORADO
This project consists of 82,000 sf. metal building system in form with reinforced foundation and floor slab, structural steel frame, metal exterior walls, standing seam metal roof, TPO roofing, cmu, cmu veneer, Vertical Lift Module or motorized rack, fixed position pallet racks, fire detection/protection system to include storage tank, special security enhancements, utilities, site improvements, landscaping, roads/parking, communications support, electrical infrastructure upgrade and all other necessary support. This project will comply with DOD antiterrorism/force protection requirements per Unified Facilities Criteria.